Proven Productivity Stories

Getting ahead together with our customers means developing solutions that are better, faster, more efficient and more cost-effective and hence help our customers outperform their competition. At Bossard, we call this holistic view "Proven Productivity".

People who work with us on a regular basis describe their experience in their own words. After all, nobody knows us better than our customers, suppliers, and employees. We give the floor to people who were personally involved in improving productivity. Hereafter a selection of 25 stories.
         
ThomasSiegenthalerABB_v
  YDMeng_Buehler
  ShiYanyu_SDLG
Quantifiable success month by month
  Reducing the 
complexity of order processing by 25 %

  Excavating the solution for fastener safety

 

 

       
Rolf-Meier-Griesser-AG
  Shangdong-Euipment-China
  Todd-Hartley
20 % gain in efficiency with one rivet
  0 production interrup-tions and no delivery delays
  1 smart idea,
1,000 great benefits

 

 

       
Ives-Muehlemann-21

  Herbert-Villiger-Bystronic
  Michael-Kaas-BNA
100,000 francs in damage prevented – thanks to a single
screw

  0 defects thanks to
360° engineering
  100,000,000 parts, 1,500 SmartBins,
1 goal: to revolutionize the automotive world

 

 

       
Richard-Penichout-Somfy

  Jacob-Lund-Hansen-BOD

  Willi-Buehlmann-Siemens

Optimized supply: 10 million parts per year with Bossard’s inven-tory management
  0 broken screws plus
an increased productivity thanks to solid material analysis

  50 % higher output
with much less input

 
 
 
       
Hans-Frehner-21

  Tom-Hicks-2

  Hans-Ryser-Heizwerkfuehrer
0 errors during phys-
ical inventory: more
time for important
tasks

  24/7 supply chain,
365 days availability

  Fastening excellence expertise for coming generations

 

 

       
Nihad-Zaugg-Signal
  Rolf-Ammann-KVT   Andreas Blättler, Engineering Consultant, Bossard Schweiz
1,800 working hours
per year saved: more time for our clients

  900 hp, 345 km/h and 50 innovations that perform as promised
  Optimized process
cuts installation time
by 50 %

 
 
 
       
Alain Berenbach, Mechanical Designer, Gebo Cermex   Luca-Introini-BIT   Urs-Guettinger-BOS
100 % cost control + 27,000 new fastening elements
  1/3 lower logistics
costs lead to better margins

  Reducing process
costs by 39 % through systematic analysis

 

 

       
Pierre-Kubalski-IMO-Pumps
  Matthias-Dorner-KVT
  Berthold Kübler, Leiter Betrieb und Logistik, Hawa AG Schweiz
100 % lean Next Generation: signifi-cantly lower total operating costs
  Installed in seconds – valuable time saved
  Faster to market with
83 % shorter through- put time

 

 

       
Juergen-Eixler-BOS
  Markus-Simitz-2
  Stephane-Talbot-2

20 % productivity gain,
0 complaints

  99 % less damage risk

  New potential 365
days a year – thanks
to strategic sourcing

 

 

       
Kanchan-Satyanarayan-Wipro-GE
 
 

Simultaneous engineering – 100 % in the service of efficiency
 

 

PDF  |  Print