Choose your country or region


South Africa

EN

Canada

FR EN

México

ES EN

United States

EN

Australia

EN

China / 中国

ZH EN

India

EN

South Korea / 대한민국

KO EN

Malaysia

EN

Singapore

EN

Taiwan / 台灣

ZH EN

Thailand

TH EN

Vietnam

VI EN

Česká Republika

CS EN

Denmark

DA EN

Deutschland

DE EN

España

ES EN

France

FR EN

Ireland

EN

Österreich

DE EN

Polska

PL EN

Schweiz / Suisse / Svizzera

DE FR IT EN

Sweden

SV EN

Netherlands

NL EN

Norway

EN

Global

EN

Please start typing to get suggestions.

Website results

Suggestions are being loaded.


Product suggestions

Suggestions are being loaded.


Customer Proven Productivity Stories

 success-stories-title

We are pleased to share with you examples of how we add value.

Honeywell - Smart Factory Logistics Transformation
Honeywell Challenges

Bossard not only supports the Fastener Product Solutions and Assembly Technology Expert Services but also provides us with Smart Factory Logistics systems. To our enterprise production, shorten the operating cycle, improve efficiency, and reduce costs. Bossard, as a reliable business partner, is a model of beneficial and win-win cooperation between our two sides.

The right goods at the right time in the right place

Biral AG produces modern pumps for use in domestic, municipal and industrial use. The traditional company with its head office in Münsingen is one of the leading Swiss providers of innovative and efficient pump solutions.

Since 2004, Bossard has been supporting Biral's internal logistics activities with innovative systems and solutions.

In keeping with the pace of times, digital processes are becoming increasingly important. Intralogistic “milk run” activities in procurement logistics are not an exception. Bossard’s Last Mile Management (LMM) – an app for internal logistics – is a proven solution here. Bossard’s in-house developed software optimizes the flow of materials at the production level and ensures a transparent exchange of information from real-time data from the central storage location to the assembly workplace.

Read the full story

A win-win solution
People

A grinding machine from Studer, Switzerland has 7,500 individual parts, 600 of which are classified as C-parts. The management costs of these C-parts are many times higher than their value. This is where Bossard identified a major potential for streamlining. 

 

Read the full story

Confidently manage large and varying amounts
Trains

Alstom Transport designs sustainable and global railway solutions tailored to operators, public authorities and passengers. Bossard has implemented the 3-level concept at seven Alstom Transport plants that lead to significant savings in costs and time in Alstom Transport’s production operations.

Read the full story

Design and assembly optimization
Road maintenance

Slipping on ice? - Not if a road maintenance machine from our customer cleared the way. Airport runways, roads, sidewalks and pathways around the world are kept free from snow and ice with high-tech machines.

Besides a long-lasting fastening solution for these high-tech machines, the customer was also looking for an improved logistics system.

With ecosyn®-lubric coated stainless steel fasteners and the Bossard SmartBin logistic system, a future-proof solution with high productivity, was introduced.

Read the full story

More time for the core business
success reference story komax processnig quadrkl

Komax Wire develops and manufactures innovative wire processing systems for international customers in the automotive, electronics and appliance industries. After assigning the C-part supply and management to Bossard, the Komax employee who had previously worked on the task was able to commit to other important responsibilities within Komax.

Read the full story

Savings of process costs
save on process costs

The Carinthian family business Pichler specializes in energy-saving ventilation systems for greater comfort indoors. In turn the company is achieving considerable savings in its process costs for the management of C-parts with the SmartBin integrated management system from Bossard.

Read the full story

Smart C-parts management
Thermo Waffelbackautomat SWAKT-HC

Read how Franz Haas GmbH in Austria was able to gain in regard to production in Austria and was able to considerably reduce its tied-up capital.

Read the full story

Jane
Jane, CEO

“My competition is fierce! Every day, I’m challenged to find new solutions to stay competitive. If I don’t reduce my costs and boost productivity I will lose more than just market share.”


 
Andrew
Andrew, Supply Chain

“If we’re missing just one tiny screw, the product can’t leave production and I have to explain what happened. How do I minimize uncertainties in my procurement process?”


 
Lee
Lee, Production Manager

“In my production process, every detail matters. I need full process visibility and high quality parts to maximize output. How do I find the perfect solution?”