Chọn quốc gia hoặc khu vực


Nam Phi

EN

Canada

FR EN

Mexico

ES EN

Mỹ

EN

Úc

EN

Trung Quốc

ZH EN

Ấn Độ

EN

Hàn Quốc

KO EN

Malaysia

EN

Singapore

EN

Đài Loan

ZH EN

Thái Lan

TH EN

Việt Nam

VI EN

Cộng hòa Séc

CS EN

Đan Mạch

DA EN

Đức

DE EN

Tây Ban Nha

ES EN

Ireland

EN

Ba Lan

PL EN

Thụy Điển

SV EN

Hà Lan

NL EN

Na Uy

EN

Toàn cầu

EN

Vui lòng nhập để nhận đề xuất.

Kết quả trang web

Đề xuất đang được tải.


Đề xuất sản phẩm

Đề xuất đang được tải.


Installation time cut by 50 %
Andreas Blättler, Engineering Consultant, Bossard Switzerland

"Start where the leverage is the greatest" 

All companies want to manufacture their products faster, better and more cost-effectively. In order to recognize the potential of lean management, an outside perspective is often useful. Such was the case at an electrical engineering company I recently consulted for. Although the company has its own R&D department, it is small and the staff is busy with day-to-day business. And I know from my own experience as a design engineer that in-house there is a real risk of blind spots. You sometimes need an objective set of eyes to identify more radical, more fundamental optimization opportunities. 

It made sense that this company asked Bossard for support because we have supplied them with fastening elements for many years. We have also successfully implemented our Bossard Inventory Management system for them. We were now tasked with helping them with their product development under the aspect of design-to-cost, that is to develop a new and more cost-effective design for their floor service boxes. 

Significant optimization potential during product development
For such projects, which we call Bossard Next Generation, the optimization potential for customers is particularly significant because the leverage is the greatest. There are two requirements for a successful Next Generation project: First, an interdisciplinary approach must be taken where all the important players work together. For the development of the floor service boxes, for example, it was important to incorporate the third-party sheet metal supplier. As an external consultant, I constantly have to be aware that I’m working on somebody else’s turf. For this reason, a second important requirement in Next Generation projects: the commitment of senior management to drive change. 

As with all Bossard Next Generation projects using the value-stream analysis methodology, I start with the existing production processes. Walking through the production halls, I gained an overall understanding of the operations from receiving to shipping. In fact, I always begin at the end: with shipping. In other words, I go backwards to understand the customer’s perspective. I also talked to the workers on the production line, with the people who assemble the product. We analyzed my findings, identified optimization potential, validated the results and then presented them to the customer. 

Less individual parts, accelerated throughput, reduced installation time
Our proposed Next Generation solution for the floor service boxes calls for far fewer screws – that alone will enable the customer to lower manufacturing costs by approximately 42 %. By reducing the number of individual parts from 23 to 16, throughput is accelerated and, as a result, the customer stands to gain 20 % in productivity. In addition, the new design reduces the installation time for the end customer by 50 % because one assembly tool is used less and the floor service boxes only have four fastening axes instead of eight. For installers, this is a big advantage because installation time is money.

Ref. BOS-NG-EL-02214